Project Description

  • Client: Parkeray Interiors
  • Location: 30 South Colonnade, London
  • Project started: 2025/November
  • Project complited: Ongoing
  • Category:

Service Overview

We installed a full temporary electrical setup to support the site during ongoing works. Our team fitted transformers, MDUs, and fused isolators to provide a stable and well-organised temporary power supply throughout the building. We also installed a range of temporary sockets to meet the power needs across all working areas on site. Alongside the power setup, we installed emergency lighting to ensure safe movement and visibility across the project. All equipment was arranged neatly and safely, giving the site team a reliable and compliant temporary electrical system.